NOJA Power

Technical Article

Published 08/2021

How Emerald PUD Improved their Network Reliability

Man is standing in front of a substation and NOJA Power OSM Recloser and RC Controller. Green overlay box contains text saying 'How Emerald PUD improved their network reliability'
How Emerald PUD Improved their Network Reliability

Emerald People’s Utility District of Eugene, Oregon, proudly serves 22,000 customers. Among the challenges of network operation in a highly forested area, Doug Barab, System Engineer at EPUD, has successfully completed a reliability program over the last 6 years, upgrading line reclosers and substation circuit breakers. Like most senior engineers in utilities of these sizes, Doug’s responsibilities span technical and managerial considerations, everything from electrical systems design, to budgeting, leadership, and even IT technical support. Throughout this project, Doug has worked with NOJA Power to deliver switchgear solutions for his challenges.

NOJA Power’s Martin van der Linde sat down with Doug Barab to discuss electricity network reliability in a US public Utility District, along with their selection process and the applications that NOJA Power’s OSM Recloser fulfils on their network.

“Congratulations to Doug Barab for what he has managed to achieve in terms of reliability improvements for the customers serviced by Emerald PUD,” reports NOJA Power Group Managing Director Neil O’Sullivan.

To get your copy of the interview, you can access it at the following location:

Download Case Study

Want to stay up to date with Electrical Distribution Technology?

Join our list for a free weekly technical bulletin, as we share our Global Electrical Engineering experience directly to your inbox.

Subscribe